214B STREET SEWER LIFT STATION UPGRADES, TOWNSHIP OF LANGLEY
Owner: Township of Langley
Description: Upgrade of an existing sanitary pump station. A new 1.8m diameter FRP lift station was inserted into the existing steel station which was decommissioned and had the top cut off. Work was done with a bypass pump system managing the flows while the station was off line. The scope of work also included supply and install of a new electrical kiosk.
CAPILANO BOOSTER PUMP/ MAINLINE PROJECT, CAPILANO GOLF & COUNTRY CLUB, WEST VANCOUVER
Owner: Capilano Golf & Country Club
Description: Approximately 800m of new irrigation piping and valving was installed, complete with a new booster pump building and an internal mechanical package. Pipe sizing ranged from 150mm to 250mm and was a mixture of ductile iron and C900 PVC. Parts of the new installation required rock removal and blasting. The work was done during the winter months when the golf course was mostly shut down.
CROSS CREEK SINK HOLE EMERGENCY WORKS, DISTRICT OF WEST VANCOUVER
Owner: District of West Vancouver
Description: Emergency repair of high use road following wash out after heavy rainfall. Creek bypassed with continuous running of 12” diesel pump while the damaged 900mm concrete pipe and intake headwall were replaced and repaired. Excavation to 4m depth to replace pipe required significant water infiltration management. Traffic management required throughout project.
CLIVEDEN AVENUE SANITARY PUMP STATION UPGRADE, CITY OF DELTA
Owner: City of Delta
Description: Upgrade of existing sanitary concrete wet well pump station, including wet-well relining with HDPE panels, installation of new stainless-steel piping, a new FRP platform and a new lid with an aluminum hatch. Supply and installation of a new precast below ground chamber for all the 200mm valves and piping, and a new electrical kiosk. A two location bypass pumping system was operated and maintained for duration of eight month project.
CEDAR DRIVE PUMP STATION & SEWER MAINS, CITY OF COQUITLAM.
Owner: City of Coquitlam.
Description: Construction of a new concrete wet well to a depth of 12 m below grade. The extensive sheet pile shoring required was installed by our own forces. The wet well was cast-in-place concrete and was sunk as a caisson. A separate concrete valve chamber and a stand-alone electrical utility building were also built. Directional drilling was used to install 700m of 350mm diameter and 350m of 450mm diameter HDPE pipe at a depth of up to 8m below grade. Open cut trenching was used to install 30m of 500mm diameter PVC gravity pipe at a depth of 10m below grade.
BATH SLOUGH CANAL BANK & PEDESTRIAN PATH REPAIR, CITY OF RICHMOND. Owner: City of Richmond.
Description: Supply and installation of 60 m of 30ft long H2607-700ft sheet piles along the Bath Slough embankment for soil stabilization. Included in the works were the installation of 60 m of a new wooden fence, a pedestrian pathway, and restoration plants.
REMEDIATION OF THE SOUTHLANDS TIDE GATE, CITY OF VANCOUVER
Owner: City of Vancouver.
Description: Two sites, Blenheim and Carrington,required the supply and replacement of two existing tide gates with new stainless-steel gates of 48" and 36". The replacement of the gates required installation of a drainage bypass system and was performed during the fisheries window and low tide periods. The third location, Dunbar, required the replacement of an existing outfall trash rack with a new galvanized rack. Work was done during low tide periods. Installation of the heavy new trash rack was done by helicopter as access was limited.
32nd PRV STATION REPLACEMENT, CITY OF SURREY
Owner: City of Surrey.
Description: Supply and installation of a new ground PRV complete with steel enclosure kiosk and associated electrical controls and instrumentation. Inlet and outlet piping is 250 mm stainless steel.
ECKERSLEY B PUMP STATION & RELATED GRAVITY FORCEMAIN PIPE WORKS, RICHMOND
Owner: City of Richmond.RICHMOND CENTRE TESLA CHARGING STATION CIVIL WORK, RICHMOND
Owner: JA Electric Inc.
GLENEAGLES INTERCEPTOR ARMOURING, METRO VANCOUVER
Owner: Metro Vancouver
54th STREET SEWER REPLACEMENT, DELTA
Owner: Corporation of Delta
YVR LIGHTING UPGRADE - GRANT MCCONACHIE WAY
Contractor: Continental Power Services (1987) Ltd.
GARRY STREET PUMP STATION IMPROVEMENTS, DELTA
Owner: Corporation of Delta
Description: Upgrade of a sanitary pump station by the installation of a new precast bypass wet well complete with secondary pump and piping.
HAWTHORNE PARK PUMP STATION INSTALLATION, DELTA
Owner: Corporation of Delta
Description: Installation of an owner supplied 4 ft. fiberglass pump station package complete with surface works, electrical kiosk, concrete pads and conduits.
DRAINAGE PUMP STATION RENOVATION WILLIAMS RD WEST, RICHMOND
Owner: City of Richmond
Description: Major refurbishment of existing Williams Road pump station, including the demolition of the existing structure and construction of a new concrete pump station and discharge structure. Construction included soil densification and structural timber piles.
DRAINAGE PUMP STATION RENOVATION NO. 4 RD. NORTH, RICHMOND
Owner: City of Richmond.
KIEWIT - PORT MANN HIGHWAY 1, SURREY
Owner: Kiewit Flatiron General Partnership
JERVIS FORCE-MAIN NO. 2 SUNSET BEACH, VANCOUVER
Owner: Metro Vancouver
1100 MARINE DRIVE, WEST VANCOUVER
Owner: District of West VancouverFRANCIS ROAD PUMP STATION, RICHMOND
Owner: City of RichmondCOLLINGS WAY AND NORUM PLACE, DELTA
Owner: The Corporation of Delta
LULU ISLAND WASTEWATER TREATMENT PLANT, RICHMOND
Owner: Greater Vancouver Sewerage and Drainage DistrictNELSON ROAD, WEST VANCOUVER
Owner: District of West Vancouver
Description: Installation of a new 10in poly storm sewer line from Nelson Road to Ocean
SEYMOUR HATCHERY UPGRADE, NORTH VANCOUVER
Owner: Greater Vancouver Water District
Description: Construction of the Seymour Hatchery Upgrade Project in North Vancouver and related work.
CULVERT REHABILITATION PROGRAM, BURNABY
Owner: City of Burnaby
Description: Rehabilitation of existing culverts by sliplining and construction of new inlet and outlet structures.
GILBERT ROAD PUMP STATION, RICHMOND
Owner: City of Richmond
Description : Installation of one 24' x 11' rectangle x 3' deep sump by caisson method.
HERITAGE BARN, MAPLEWOOD FARM, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Repaired, renovated and constructed a new foundation for the Heritage Farm - Maplewood Children's Farm.
KINSMEN FIELD ALUMINUM BLEACHER, NORTH VANCOUVER
Owner: City of North Vancouver
Description: Coordinated the installation of a 610 person capacity aluminum bleacher.
PORT KELLS PUMP STATION, SURREY
Owner: City of Surrey
Description: Renovation of existing pump station.
MOUNTAIN HIGHWAY & DOMINION STREET SEWAGE LIFT STATION,
NORTH VANCOUVER
Owner: District of North Vancouver
District: Completed pump station retrofitting works at Mountain Highway and Dominion Street sewage lift station.
THAIN CREEK CULVERT REPLACEMENT, NORTH VANCOUVER
Owner: City of North Vancouver
Description: Construction of the Thain Creek replacement concrete culvert, and open channel drainage and landscaping work, all under strict environmental guidelines.
SUICIDE BEND SHORELINE PROTECTION, WEST VANCOUVER
Owner: District of West Vancouver
Description: Performed erosion control work, including excavation of existing shoreline and construction of specified shoreline protection works. Restored localized areas of bank degradation at elevations above shoreline protection works.
CULVERT REHABILITATION PROGRAM, BURNABY
Owner: City of Burnaby
Description: Rehabilitated 35m of 2000mm x 1200mm CSP culvert, 25m of 1200mm diameter RC culverts & constructed fisheries improvements. Constructed impact stilling basin at end of 750mm diameter RC culvert.
REFURBISHING DUNDARAVE PARK PLAYGROUND, WEST VANCOUVER
Owner: District of West Vancouver
Description: Removal and replacement of outdated play equipment, paths, retaining walls, landscaping and play structures.
DOLLARTON HIGHWAY, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Construction of 360m of trunk storm sewer, outfall structure, shoreline works, 210m of water-main, erosion and sediment control and related works.
CHILCO BYPASS & BROCTON WEIR, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description: Re-routed sanitary and storm sewers to decrease the amount of raw sewage dumping into the Burrard Inlet during heavy rainfall.
NEW WESTMINSTER INTERCEPTOR, NEW WESTMINSTER
Owner: GVRD Sewage & Drainage Department
Description: A 900m long section of 1050 to 1500mm diameter concrete sewer main was temporarily bypassed above ground to allow for the rehabilitation of the concrete sewer main with Linabond PVC polymer.
CYPRESS/HOLLYBURN SEWER LINK, WEST VANCOUVER
Owner: Ministry of Environment, Lands & Parks
Description: Connection of a 200mm diameter sewer line in a 10m vertical section.
HUDSON STREET GRIT CHAMBER, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description: Installed a 2400mm x 1500mm pre-cast concrete box culvert grit chamber adjacent to the Hudson Street pump station.
VERNON DRIVE FORCEMAIN, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description:The largest live sewer tie-in performed in Canada
(45" diameter steel sewer line).
HATZIC SLOUGH SUPPLY MAIN, MISSION
Owner: Fraser River Regional District
Description: A 1050 diameter, 1km long steel pipe was pulled across the Fraser River in Mission during harsh winter conditions. Work included dredging a 900m long trench across the Fraser, 500m of open trench land installation and installing a below grade concrete valve chamber.
DEEP COVE SEWAGE PUMP STATION UPGRADE, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Installation of two pump stations and upgrading of a third.
MCBRIDE BOULEVARD SEWER VENT, NEW WESTMINSTER
Owner: GVRD Sewage & Drainage Department
Description: Constructed odor control facilities.
STEEL CASING PIPE, BURNABY
Owner: GVRD, Water Engineering
Description: Installation of a1525mm steel casing pipe inside a 2m diameter tunnel liner under the Westburnco water reservoir.
ANSELL PLACE WASTE WATER TREATMENT PLANT OUTFALL REHABILITATION, WEST VANCOUVER
Owner: District of West Vancouver
Description: Construction of 2.5m outfall over the West Vancouver foreshore.
LINCOLN AVE. LIFT STATION PORT COQUITLAM
Owner: City of Port Coquitlam
Description: Constructed a small pump station using two cages and performed related tie-ins.
DOMINION AVENUE LIFT STATION, PORT COQUITLAM
Owner: City of Port Coquitlam
Description: 3m x 3m caisson pump station was sunk and related works completed.
CANADA WAY/GILMORE WATERMAN REHABILITATION, BURNABY
Owner: City of Burnaby
Description : Slip lining of an existing 900m long, 710mm diameter steel forcemain with a 600mm HDPE pipe along a major arterial road.
8TH AVENUE INTERCEPTOR & KEITH DRIVE, VANCOUVER
Owner: Great Vancouver Regional District
Description: Installation of sheet piling for deep excavation needed to join a tunnel between the 8th Avenue Interceptor and the Brockton Sewer.
HIGHBURY INTERCEPTOR OVERFLOW STRUCTURE MODIFICATIONS, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description: Raised an overflow weir for the Brocton sewer outfall to Iona Island.
EASTRIDGE FORESHORE SEWER PROJECT, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Installation of a sewer forcemain, including a pump station and 165m of underwater main along the extremely environmentally sensitive Deep Cove foreshore.
SLOPE STABILIZATION, PARKSIDE LANE, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Construction of an approximately 9m high lock block wall with access only via the beach foreshore.
STORM & SANITARY SEWER SEPARATION AT SKEENA TERRACE, VANCOUVER
Owner: British Columbia Housing Management Commission
Description: Separated storm and sanitary sewers in Skeena Terrace.
EAST RICHMOND AGRICULTURAL WATER SUPPLY , RICHMOND
Owner: City of Richmond
Description: Construction of a100kW irrigation pump station (caissons method) adjacent to the Fraser River, with a 91m long, 1220mm diameter intake pipe going into the river. Completion of related works to provide irrigation for the cranberry fields.
CARIBOO DAM APRON REPAIR, BURNABY
Owner: Greater Vancouver Regional District
Description: Placement of concrete at the front of the Cariboo Dam and installation of a tarp wall to isolate the "concrete water" from the rest of the reservoir.
WOODLANDS/SUNSHINE WATER SYSTEM, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Installed approximately 5.5km of pipe, 300mm and 200mm diameter, along the shores of Indian Arm. Work included the installation of two concrete PRV chambers and an approximately 500m long, 250mm diameter underwater main. 66% slope in many areas.
DOMINION AVENUE PUMP STATION, PORT COQUITLAM
Owner: City of Port Coquitlam
Description: Installation of a pump station and excavation of a retention pond, to accommodate the increased run-off predicted for an upcoming development.
HASTINGS TIE-IN CHAMBER, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description: Installed tie-in chambers.
GULF VIEW WYND STORM SEWER OUTFALL & IMPROVEMENTS, DELTA
Owner: The Corporation of Delta
Description: Installation of a 450mm diameter steel pipe for a storm sewer between the US and Canadian borders. Installation of a 600m storm outfall, a concrete outfall structure, and a storm and sanitary main. Highlights included descending 70m on a 50 plus degree slope and the installation of a concrete dissipation chamber. Maximum slope 87.33%.