PIPELINES
Waterworks




West Coast Chip Plant Reduce Pressure Backflow Assembly, Vancouver Fraser Port Authority

Owner: Vancouver Fraser Port Authority

Description:Supply and installation of an 8" backflow preventor and heated kiosk housing. Work included connection into existing underground water line along with the installation of new overhead electrical power.







Emergency Wood Stave Culvert Replacement, Richmond

Owner: City of Richmond

Description: Replacement of a 750mm wood stave storm culvert running across New Westminster Highway at No. 8 Road, with a 750mm Class 4 reinforced concrete pipe. Work included major intersection traffic management for the duration of the project.







Inlet Road Forcemain Control Valve Upgrade, Sechelt

Owner: District of Sechelt

Description: Forcemain extension and 12" Rotork control valve replacement inside an existing chamber.







Ship Loading Pipeline Replacement, Port Metro Vancouver

Owner: West Coast Reduction Ltd.

Description: Concrete demolition and removal of 450m of existing 8" steel pipeline and replacement with new stainless steel pipeline in casing pipe on the Port Metro Vancouver container docks.









Riverside Landing Housing Cooperative, Vancouver
   
Owner: Riverside Landing Housing Cooperative
   
Consultant: Kerr Wood Leidal.
                   
Description: Replacement of individual water-mains in a Cooperative housing complex of 58 units. This included replacement of individual water service connections with new HDPE lines and new internal PRV's, complete with upgraded plumbing. Installation of a new PRV box complete with 500m of new HDPE 50mm lines.    







KIEWIT - PORT MANN HIGHWAY 1, SURREY

Owner: Kiewit Flatiron General Partnership

Description: Water-main Relocation 182nd/96th & Highway 1: Installation of 170 m of 600mm diameter ductile iron water-main, including tie-in at both ends to existing water-main.

Kiewit 182

 
 
 

Seymour Hatchery Upgrade, North Vancouver

Owner: Greater Vancouver Water District

Consultant: Kerr Wood Leidal Associates Ltd.

Description: Construction of the Seymour Hatchery Upgrade Project in North Vancouver and related work.
   
 
 


Ha
tzic Slough Supply Main, Mission

Owner
: Fraser River Regional District

Consultant: Dayton & Knight Ltd.

Description
: A 1050 diameter, 1km long steel pipe was pulled across the Fraser River in Mission during harsh winter conditions. Work included dredging a 900m long trench across the Fraser, 500m of open trench land installation and installing a below grade concrete valve chamber.



         
 
 
         
 