PIPELINES
Sanitary
 
 
 
TYNEHEAD SANITARY SIPHON PRESSURE MONITORS, SURREY

Owner: City of Surrey

Consultant: Omni Engineering Inc

Description: Wet-tap into existing 24 inch and 32 inch HDPE sanitary pressure main for installation of pressure data loggers.



Twin Sewers, GCCJV, Maple Ridge

Contractor: Golden Crossing Constructors Joint Venture

Description
: Installation, welding, coating and testing of two parallel GVRD 760mm diameter and 1076 diameter sanitary forcemain steel pipes  approxi-mately 300m long, including tie-ins to existing line, and decommissioning of temporary bypass line. Installation of 191m of 600mm HDPE sanitary sewer pipe including tie-ins to existing manholes.
  Twin Sewers
     

Lulu Island Wastewater Treatment Plant, Richmond

Owner:
Greater Vancouver Sewerage and Drainage District

Description
: Installation of two sections of 2100mm diameter steel pipe, construction of reinforced concrete chamber, modification and restoration of the chlorine contact outfall chamber and related work.
  Lulu Island
     

8th Avenue Interceptor & Keith Drive, Vancouver

Owner: Great Vancouver Regional District

Consultant: Dayton & Knight Ltd.

Description
: Installation of sheet piling for deep excavation needed to join a tunnel between the 8th Avenue Interceptor and the Brockton Sewer.
  8th Avenue
     

Eastridge Foreshore Sewer Project,
North Vancouver


Owner:
District of North Vancouver

Consultant:
Kerr Wood Leidal Associates Ltd.

Description:
Installation of a sewer forcemain, including a pump station and 165m of underwater main along the extremely environmentally sensitive Deep Cove foreshore.
  Eastridge
     

     
 
     
 