TYNEHEAD SANITARY SIPHON PRESSURE MONITORS, SURREY
Owner: City of Surrey
Consultant: Omni Engineering Inc
Description: Wet-tap into existing 24 inch and 32 inch HDPE sanitary pressure main for installation of pressure data loggers. |
|
|
|
Twin Sewers, GCCJV, Maple Ridge
Contractor: Golden Crossing Constructors Joint
Venture
Description:
Installation, welding, coating and testing of two parallel GVRD
760mm diameter and 1076 diameter
sanitary forcemain steel pipes approxi-mately
300m
long, including tie-ins to existing line, and decommissioning of
temporary bypass line.
Installation of 191m of 600mm HDPE sanitary sewer pipe including
tie-ins to existing manholes.
|
|
|
|
|
|
|
Lulu Island Wastewater Treatment Plant,
Richmond
Owner:
Greater Vancouver Sewerage and Drainage District
Description:
Installation of two sections of 2100mm diameter
steel pipe, construction of
reinforced concrete chamber, modification and restoration of the
chlorine
contact
outfall
chamber
and related work. |
|
|
|
|
|
|
8th Avenue Interceptor & Keith Drive,
Vancouver
Owner:
Great Vancouver Regional District
Consultant:
Dayton & Knight
Ltd.
Description:
Installation of sheet
piling for deep
excavation needed to
join a tunnel between
the 8th Avenue
Interceptor and the
Brockton Sewer. |
|
|
|
|
|
|
Eastridge Foreshore Sewer Project,
North Vancouver
Owner: District of North Vancouver
Consultant:
Kerr Wood Leidal Associates Ltd.
Description:
Installation of
a sewer forcemain, including a pump station and 165m of
underwater main along the extremely
environmentally sensitive Deep Cove foreshore. |
|
|
|
|
|
|
|
|
|