2024

CEDAR DRIVE PUMP STATION & SEWER MAINS, CITY OF COQUITLAM.
Owner:  City of Coquitlam.
Description: Construction of a new concrete wet well to a depth of 12 m below grade. The extensive sheet pile shoring required was installed by our own forces. The wet well was cast-in-place concrete and was sunk as a caisson.A separate concrete valve chamber and a stand-alone electrical utility building were also built. Directional drilling was used to install 700m of 350mm diameter and 350m of 450mm diameter HDPE pipe at a depth of up to 8m below grade. Open cut trenching was used to install 30m of 500mm diameter PVC gravity pipe at a depth of 10m below grade. See photo











SELECTED
PROJECTS
2023

BATH SLOUGH CANAL BANK & PEDESTRIAN PATH REPAIR, CITY OF RICHMOND.
Owner:  City of Richmond.
Description: Supply and installation of 60 m of 30ft long H2607-700ft sheet piles along the Bath Slough embankment for soil stabilization. Included in the works were the installation of 60 m of a new wooden fence, a pedestrian pathway, and restoration plants. See photo















REMEDIATION OF THE SOUTHLANDS TIDE GATE, CITY OF VANCOUVER
Owner:  City of Vancouver.
Description: Two sites, Blenheim and Carrington,required the supply and replacement of two existing tide gates with new stainless-steel gates of 48" and 36". The replacement of the gates required installation of  a drainage bypass system and was performed during the fisheries window and low tide periods. The third location, Dunbar, required the replacement of an existing outfall trash rack with a new galvanized rack. Work was done during low tide periods. Installation of the heavy new trash rack was done by helicopter as access was limited. See photo















32nd PRV STATION REPLACEMENT, CITY OF SURREY
Owner:  City of Surrey.
Description: Supply and installation of a new ground PRV complete with steel enclosure kiosk and associated electrical controls and instrumentation. Inlet and outlet piping is 250 mm stainless steel. See photo











SELECTED
PROJECTS
2022

COTTON B SANITARY LIFT STATION, DISTRICT OF WEST VANCOUVER
Owner:  District of West Vancouver.
Description: Upgrade of an existing 1200 mm diameter concrete pump station to a new 1800 mm diameter FRP station complete with separate valve chamber, new electrical control kiosk and standby generator. New forcemain and gravity requiring bypass are part of the work. See photo
















205 STREET SEWER LIFT STATION UPGRADES, TOWNSHIP OF LANGLEY
Owner:  Township of Langley.
Description: Upgrade of an existing 1800 diameter concrete pump station with a new slip-in 1800 mm diameter FRP pump station complete with built in valve kiosk and new electrical control kiosk. New forcemain and gravity lines requiring bypass are part of upgrade. See photo













2021

ECKERSLEY B PUMP STATION & RELATED GRAVITY FORCEMAIN PIPE WORKS, RICHMOND
Owner:  City of Richmond.
Description: Replacement of existing Eckersley B Sanitary Pump Station along with construction of an extension of the existing sanitary gravity and forcemain sewers to the new pump station location. See photo















112 th ST CULVERT REPLACEMENT,  DELTA
Owner:  City of Delta
Description: Replacement of 20m of an existing 1200mm diameter CSP culvert drainage pipe with new 1500mm diameter sanitate pipe c/w new MSE headwalls. The work required sheet piling and dewatering to insulate the working area of ditch and ground water in an environmental sensitive area. See photo












2020

SHELL ROAD NORTH DRAINAGE PUMP STATIONS UPGRADE, RICHMOND
Owner:  City of Richmond.
Description: The demolition and decommissioning of an existing drainage pump station. Installation of new combined MCC and generator building. Refurbishment of pump building complete with new top side structure, pump tubes and pumps. Work includes sliplining of an exiting corrugated pipe with a new HDPE pipe, timber densification pilling, sheet pile retaining walls and dewatering and bypass pumping. See photo















SPRUCE GROVE SEWER LIFT STATION UPGRADE, WHISTLER
Owner:  Resort Municipality of Whistler.
Description: H2S resistant lining of the Spruce Grove wet well with Predl systems concrete protective liner. Work included bypassing the existing pump station wet well with 8-inch diameter dri-prime pumps for approximately three months; deep cleaning of the pump station wet well; Installation of Predl panels complete with grouting the void between the existing wall and the installed panels; and replacement of corroded piping and related items. See photo













2019

RICHMOND CENTRE TESLA CHARGING STATION CIVIL WORK, RICHMOND
Owner:  JA Electric Inc.
Description: Installation of 20 electric car charging stations, including trenching and excavation for electrical conduct installation along with the installation of three cast-in-place concrete equipment pads. See photo















WEST COAST CHIP PLANT REDUCED PRESSURE BACKFLOW ASSEMBLY, VANCOUVER FRASER PORT AUTHORITY
Owner:  Vancouver Fraser Port Authority
Description: Supply and installation of 8" backflow preventor and heated kiosk housing. Work included connection into existing underground water line along with the installation of a new overhead electrical power. See photo















MISSION CREEK AT EVERGREEN PLACE CULVERT, DISTRICT OF NORTH VANCOUVER
Owner:  District of North Vancouver
Description: Replace an existing 23m long, 1.2m diameter concrete culvert with a 23m long, 4.9m wide x 2.5m high galvanized corrugated steel culvert. Work included concrete culvert; excavating a 30m long 7m wide trench through an existing roadway and supporting all utilities, including a 300mm diameter watermain; creating a new fish friendly creek bottom and re-instating all disturbed riparian areas, utilities and roadways, complete with catch basins. See photo















FISHTRAP CREEK MITIGATION WELL, DEACON ST ABBOTSFORD
Owner:  City of Abbotsford
Description: Supply and install submersible well pump with pitless adapter for mitigation of water levels on Fishtrap Creek. Supply and install flow control kiosk unit complete with electrical and instrumentation requirements, including SCADA. All associated excavation, backfill concrete work, re-grading and paving included. See photo















DRAINAGE CULVERTS SLIP LINING, CITY OF DELTA
Owner:  City of Delta
Description: Sliplining of two existing culverts; one a 17m long 750mm diameter concrete pipe with a 26" HTP pipe, and the other, a 22m long 1050mm diameter corrugated metal pipe with a 1200mm weholite -HDPE pipe. See photo















TILBURY AREA SANITARY SEWER IMPROVEMENTS, DELTA
Owner:  City of Delta
Description: Supply and installation of a new FRP 8ft. sanitary pump station, along with the electrical kiosk. Installation of 1420m HDPE pipe by open trench, directional drilling and pipe bursting. See photo















LA POINTE PIER, SUBSIDENCE REMEDIATION, VANCOUVER FRASER PORT AUTHORITY
Owner:  Vancouver Fraser Port Authority
Description: The remediation of a sinkhole, involving excavation and installation of filter fabric replacement with new backfill and repaving. 















MAIN STREET DOCK SANITARY PUMP STATION UPGRADING PROJECT, VANCOUVER FRASER PORT AUTHORITY
Owner:  Vancouver Fraser Port Authority
Description: The upgrade of an existing sanitary pump station. Works included installation of two new pumps complete with piping, valves and central kiosk. 















FENTON TRASH RACK SYSTEMS, PITT MEADOWS
Owner:  City of Pitt Meadows
Description: Installation of moving debris screen onto an existing drainage pump station. Includes the dewatering of the watercourse with the use of sheet piling for the water channel isolation. Work includes new electrical controls for the screens and auxiliary water pumps. See photo















PRV & PUMP STATION UPGRADES, PITT MEADOWS
Owner:  City of Pitt Meadows
Description: Removal of two existing PRV substations, of 10" and 12" diameter pipes sizes, and replacement with new, above ground PRV stations. Also, upgrading of an existing sanitary 6 ft. diameter FRP station with new pumps, valves electrical kiosk.
 See photo












2018

GLENEAGLES INTERCEPTOR ARMOURING,  METRO VANCOUVER
Owner:  Metro Vancouver
Description: Armouring of 30m of exposed and undermined 450mm RCP for sanitary sewer. This pipe was below the water line at high tide. Work took place in an inter-tidal zone considered inhabited by marine fish and under the jurisdiction of the Federal Fisheries Act. Forming, re-bar installation, sealing and concrete pour with specialty rapid set high strength Chronolia Concrete all took place at low tide. A barge and work boat were used for the concrete pour. Final placement of 50kg rip rap carried out with excavator operated from a barge. See photo















EMERGENCY WOOD STAVE CULVERT REPLACEMENT, RICHMOND
Owner:  City of Richmond
Description: Replacement of a 750mm wood stave storm culvert, running across New Westminster Highway at No. 8 Road, with a 750mm Class 4 reinforced concrete pipe. Work included major intersection traffic management for the duration of the project.        
See Photo















MARINE DR AT THE BEACH SANITARY LIFT STATIONS & SERVICES UPGRADE, WEST VANCOUVER
Owner:  District of West Vancouver
Description: Removal and replacement of five existing pump stations with three new 8 ft.diameter FRP stations along the West Vancouver foreshore.  Installation of 600 m of HDPE pipe by directional rock drilling, pipe-bursting, rock blasting and CIPP lining.
See Photo















BRITANNIA HERITAGE SHIPYARD FLOOD PROTECTION IMPROVEMENTS, RICHMOND
Owner:  City of Richmond
Description: Flood-proofing and raising of the existing 225m of wooden bulkhead flood-wall by installation of vinyl sheet piles. The sheet piles were then wrapped in new wood to retain the heritage site look .

See photo















CITRUS WYND WASTEWATER TREATMENT PLANT UPGRADE, WEST VANCOUVER
Owner:  District of West Vancouver
Description: Installation and upgrade of various mechanical components in functioning sewage treatment plant, including new valves, piping, cranes and platforms. See Photo












2017

54th STREET SEWER REPLACEMENT, DELTA
Owner:  Corporation of Delta
Description: Sewer replacement of approximately 180 meters of existing  200mm diameter asbestos cement (AC) sanitary sewer gravity main. A majority of the main replacement done by trenchless HDPE pipe bursting installation. See Photo















SCOTT ROAD FORCEMAIN & PUMP STATION UPGRADE, SURREY
Owner: City of Surrey
Description: Upgrading of an existing skytrain sanitary pump with new pumps, accessories and the installation of 130m of 3" HDPE forcemain by directional drilling.
See Photo















PITT MEADOWS AIRPORT AND BOUNDARY BAY AIRPORT
Contractor.  Continental Power Services (1987) Ltd.
Description: Installation of electrical conduit along airport runways.















FLOWMETER INSTALLATION, CAPILANO GOLF & COUNTRY CLUB,  WEST VANCOUVER
Owner:  Capilano Golf Country Club
Description: Installation of flowmeters complete with isolation valves and manholes at three locations servicing the golf course. Slip lining of existing concrete pipe with 150 ft of 8-inch HDPE to restore pond cross drainage.















NO. 2 ROAD CULVERT REPAIR, RICHMOND
Owner:   City of Richmond
Description: Demolition and removal of 50m of existing concrete box storm culvert and replacement with new concrete box culvert sections. Well pointing, sheet piling and water treatment implemented. See Photo















PRV UPGRADE AND FLOWMETER INSTALLATION, SURREY
Owner: City of Surrey.
Description: PRV installation, including below grade chambers, flow meters and piping for five sites: 116th Ave; 164th St & 95th Ave; 164th St &96th Ave; Whalley 105th Ave & 148th St. See Photo















PUMP STATION UPGRADES, UBC
Owner:  University of British Columbia
Description: Vanier, installed new gate valves into existing pump station
Cecil Green, installed new submersible waste pump assemblies complete with valve chamber bypass. Power House, installed inlet & outlet expansion joints on three vertical pumps supplying fire suppression water . Henry Angus, installed temporary pump station.












2016

CRANBERRY SLOUGH FLOODGATE GASKET REPLACEMENT, PITT MEADOWS
Contractor:  J Cote & Son Excavating.
Description: Installation of stop log channel support and stop logs, complete with new flood gate door gaskets. Work included field welding and installation of nelson studs and rebar, complete with forming and concrete installation.















SILVERDALE PLACE CULVERT REHABILITATIONS -  NORTH VANCOUVER
Owner:  District of North Vancouver
Description: Installation of Weholite HDPE pipe in existing wood stave culverts and retrofitting of outfalls with stainless steel and concrete fish ladders. See Photo















WEST VANCOUVER  - MISCELLANEOUS PROJECTS
Owner:  District of West Vancouver.
Description:  The Dale Park  -Culvert and slope repairs. Lawson Creek - Culvert intake at Inglewood Avenue.















INLET ROAD FORCEMAIN CONTROL VALVE UPGRADE  - SECHELT
Owner:  District of Sechelt.
Description:  Forcemain extension and 12" Rotork control valve replacement inside and existing chamber. See Photo















SANITARY PUMP STATION GENERATOR UPGRADES - SURREY
Owner:  City of Surrey.
Description:  Emergency power generator installation for four pump stations including civil works, electrical conduit installations and connections complete with generator automatic transfer switch installation: Douglas PS - 200 - 171st St; Burkhardt PS -154th  St at 68th Ave; Stewart Farm PS - Crescent Rd at 35th Ave; Quibble Creek PS - King George St at 94th Ave; Liverpool PS. See Photo















BRANDRITH DRAINAGE PUMP STATION UPGRADES - CORPORATION OF DELTA
Owner:  Tsawwassen First Nation.
Description:  Replacement of two submersible propeller pumps, complete with new metal columns and cast inlets.  Supply and installation of Motor Control Center (MCC) and Variable Frequency Drive (VFD) Chanel dewatering through sheet piling and bypass pumping. See Photo















FRASER WHARVES METER SEPARATION- PORT METRO VANCOUVER
Owner:  Port Metro Vancouver.
Description:  Installation of new 4" water meter, complete with chamber and new 10" above ground reduced backflow preventer. See Photo












2015

YVR LIGHTING UPGRADE - GRANT MCCONACHIE WAY
Contractor:   Continental Power Services (1987) Ltd.
Description:  Trench excavation for electrical conduit installation along and across McConachie Way.















RUNWAY LIGHTING CONDUIT INSTALLATION, BOUNDARY BAY AIRPORT
Contractor:  Continental Power Services (1987) Ltd.
Description:  Concrete saw-cutting and trench excavation for installation of electrical lighting conduit along airport runway.
















TYNEHEAD SANITARY SIPHON PRESSURE MONITORS, SURREY
Owner:  City of Surrey
Description:  Wet-tap into existing 24 inch and 32 inch HDPE sanitary pressure main for installation of pressure data loggers.
See photo.















BINNING TOWER UBC, VANCOUVER
Developer:  Wall Financial Corporation
Description:  Construction of cast in place concrete detention tank and installation of 40m of new 200mm diameter ductile iron waterline complete with valves and hydrant.
















SANITARY PUMP STATION, SPRUCE GROVE, WHISTLER
Owner:  Resort Municipality of Whistler
Description:  Pump station piping upgrade including new 400mm diameter gate valve and bypass port, complete with station bypass.
















SHIP LOADING PIPELINE REPLACEMENT, PORT METRO VANCOUVER
Owner:  West Coast Reduction Ltd.
Description:  Concrete demolition and removal of 450m of existing 8" steel pipeline and replacement with new stainless steel pipeline in casing pipe on the Port Metro Vancouver container docks.
See photo.















SEWAGE LIFT STATION UPGRADES, NAOMI LIFT STATION NO. 24, NORTH VANCOUVER
Owner:  District of North Vancouver
Description:  Upgrade of existing lift station complete with new valve chamber and wet well mechanical piping, and electrical kiosk modifications.  Work also included upgrade to access path including new stairs.
See photo.















NEWDALE CULVERTS, NORTH VANCOUVER
Owner:  District of North Vancouver
Description:  Repair of existing 1050mm diameter concrete culvert funning underneath Newdale Court by sliplining with a 900mm diameter HDPE pipe.
















WATERMAIN FLOW METERS REPLACEMENT, NEW WESTMINSTER
Owner:  Corporation of the City of New Westminster
Description:  Supply and installation of four new inline flow meters, complete with electrical kiosk modifications.













2014

YAMBURY ROAD STORM SEWER CULVERT REHABILITATION, QUALICUM BEACH
Owner: Town of Qualicum Beach
Description: Slipline installation of 1400mm diameter HDPE pipe lining material to restore the structural integrity of the 60m of existing corrugated metal storm pipe.

See photo.















MCKECHNIE PUMP STATION DEBRIS SCREEN, PITT MEADOWS
Owner: City of Pitt Meadows
Description: Installation of an automated debris screen system. Work involved dewatering a watercourse for the construction of a cast-in-place concrete slab, and installation of an automated de
bris screen, stainless steel piping, electrical conduit, level transducers and control kiosks. See photo.















CITY CENTRE PUMP STATION & FORCEMAIN, COQUITLAM
Owner: City of Coquitlam
Description: Construction of new sanitary pump station, complete with in ground fiber-reinforced polymer (FRP) wet well and architecturally designed building for motor control centre (MCC) and standby diesel generator.
See photo.















SANITARY LIFT STATION UPGRADE 28B AVENUE & 216TH STREET, LANGLEY
Owner: Township of Langley
Description: Installation of two pumps at 28B and two pumps at 216th Street.  Upgrading of two existing pump stations complete with new piping and valve chamber, including relining of 216th Street pump station with cured in place lining.
See photo.












2013

STORM SEWER BOX CULVERT REPLACEMENT - NO. 2 RD, RICHMOND
Owner: City of Richmond
Description: Demolition and removal of collapsed existing box culverts and supply and installation of ten new 3m x 1.5m culverts complete with 1050mm diameter access manhole and storm sewer connections. See photo.















GARRY STREET PUMP STATION IMPROVEMENTS, DELTA
Owner: Corporation of Delta
Description: Upgrade of a sanitary pump station by the installation of a new precast bypass wet well complete with secondary pump and piping. See photo.















HAWTHORNE PARK PUMP STATION INSTALLATION, DELTA
Owner: Corporation of Delta
Description: Installation of an owner supplied 4 ft. fiberglass pump station package complete with surface works, electrical kiosk, concrete pads and conduits.















DRAINAGE PUMP STATION RENOVATION WILLIAMS RD WEST, RICHMOND
Owner: City of Richmond
Description: Major refurbishment of existing Williams Road pump station, including the demolition of the existing structure and construction of a new concrete pump station and discharge structure. Construction included soil densification and structural timber piles. See photo.












2012

RIVERSIDE LANDING HOUSING COOPERATIVE, VANCOUVER
Owner: Riverside Landing Housing Cooperative 
Description: Replacement of individual water mains in a Cooperative housing complex of 58 units. This included replacement of individual water service connections with new HDPE lines and new internal PRV's, complete with upgraded plumbing. Installation of a new PRV box complete with 500m of new HDPE 50mm lines to 75mm water-mains was included. Additional work included some sanitary line repairs, complete with clean outs and manhole installations. See photo.















OTTLEY & AXFORD CREEK, PORT MOODY 
Owner: Greater Vancouver Regional District
Description: Removal and replacement of existing 600mm diameter culvert,
and installation of new intake head wall and 1800mm manhole at Ottley Creek.
Installation of 600mm precast head wall intake structure and 1500mm manhole at Axford Creek.















SANITARY PUMP STATION #2 UPGRADES, CHILLIWACK
Owner: City of Chilliwack
Description: Upgrading of the existing pump station,including new mechanical,piping,flow meter chamber and new underground piping tie-in work.
See photo.















BRIDGE SANITARY PUMP STATION UPGRADES, BURNABY
Owner: City of Burnaby
Description: Complete upgrade of existing in-ground lift station,including installation of new pumps and mixer, electrical kiosk, valve chamber and odor control unit.
See photo.















POTABLE  WATER SUPPLY, BELCARRA TERRESTRIAL WORK 
Owner: Village of Belcarra.
Description: Construction of a pig receiving station along the Midden Road easement in Belcarra. Construction of a Booster pump-station at the Tatlow Rd. reservoir.
Installation of PLC and HMI at the Village Municipal Office and connecting to the existing fiber-optic cable.  See photo.















POTABLE WATER SUPPLY MARINE PIPELINE - TERRESTRIAL WORK,
NORTH VANCOUVER

Owner: Village of Belcarra.
Description: Construction and installation of 4" water valve chamber complete with associated in-ground piping, tie-ins to existing water-mains,and supply and installation of electrical kiosk. See photo.












2011




DRAINAGE PUMP STATION RENOVATION NO. 4 RD. NORTH, RICHMOND
Owner: City of Richmond.
Description: Major refurbishment of existing #4 Road Drainage Pump Station including the building of new control building, generator building, public washroom, overhead gantry crane structure, and construction of a public maintenance/plaza area. See photo.












 

PIPE BURST AND SEWER RELOCATION, THRIFT AVENUE, WHITE ROCK
Owner: City of White Rock
Description: Installation of a temporary bypass line.
See photo.















KIEWIT - PORT MANN HIGHWAY 1, SURREY & BURNABY
Owner:
Kiewit Flatiron General Partnership
Description: Water-main Relocation, 156th Ave. & Highway 1: Installation of 220m of 450mm diameter ductile iron water-main, including tie-ins at both ends, to existing water-mains, including valves and fittings.Temporary Water-main Bypass - 104th Avenue & 176th: Supply and installation of temporary 250mm HDPE water-main complete with 42m of 400mm casing pipe and tie-ins.Sanitary Sewer Relocation. Government and Highway 1: Supply and installation of 25m of 500mm concrete casing pipe and installation of 65m of 450mm SDR PVC sanitary pipe, complete with by-passings and tie-ins to existing sanitary sewer lines.















NO. 3 RD SOUTH DRAINAGE PUMP STATION SCREENS UPGRADE, RICHMOND
Owner: City of Richmond
Description:
Demolition and removal of existing inlet structure and construction of new and expanded concrete inlet structure. See photo.















DUNLOP PRV STATION CONSTRUCTION, DELTA
Owner: The Corporation of Delta

Description: Construction of new, above ground PRV station housed in a building 7.4m long and 6.2m wide, including all mechanical and electrical installations.
See photo.















DELTA PUMP STATION
Owner: City of Burnaby.
Description: Upgrade of existing sewage pump station, including installation of 150m of 200mm  force-main.
See photo.












2010


KIEWIT - PORT MANN HIGHWAY 1, SURREY
Owner: Kiewit Flatiron General Partnership

Description: Water-main Relocation 182nd/96th & Highway 1: Installation of 170 m of 600mm diameter ductile iron water-main, including tie-in at both ends to existing water-main. See photo.















TRENCHLESS REHABILITATION OF STORM CULVERTS, NORTH VANCOUVER

Owner: District of North Vancouver
Description: Rehabilitation of approximately 154m of 450mm, 910mm, 1050mm, and 1200mm diameter corrugated metal and wood stave culverts in various North Vancouver locations using trenchless technologies. See photo.












 

 

NORTH ROAD PRV STATION UPGRADE, PORT MOODY

Owner: City of Port Moody
Description: Upgrading of the pressure reducing valve (PRV) station,  including  reconstruction of building; supply and installation of flow-meter, piping and valves; upgrading of existing electrical systems, and miscellaneous site work.

 See photo.



   
2009   JERVIS FORCE-MAIN NO. 2 SUNSET BEACH, VANCOUVER
Owner: Metro Vancouver
Description: Installation of force-main, including coating and installation of 60m of 914mm steel pipe and appurtenances; set up of a temporary bypass; construction of a cast-in-place concrete junction valve chamber; and fabrication, coating and installation of 914mm diameter steel tie-in. See photo.
     
 
SANITARY SEWER FORCE-MAIN VALVE INSTALLATION, SOUTH DELTA
Owner: The Corporation of Delta
Description: Installation of a pre-cast concrete valve chamber, 600 diameter steel piping, valves and clean-outs on to an existing active 600 diameter HDPE raw sewage force-main.
     
    MADRONA STREET, WEST VANCOUVER
Owner: District of West Vancouver
Description: Replacement of 129m of a ruptured AC 6” waterline with 6” HDPE pipe using pipe bursting method. See photo.
     
    BIG BEND PUMP STATION, SURREY
Owner: City of Surrey
Description: Upgrading of existing sanitary pump station including replacement of all mechanical piping and pumping equipment, along with the removal of asbestos in the electrical building. Work also included the installation of a temporary bypass station.
See photo.
     
    HORSESHOE SLOUGH PUMP STATION, RICHMOND
Owner: City of Richmond
Description: Demolition and reconstruction of a pump station existing reinforced concrete inlet structure and intake trash screen. See photo.
     
    TWIN SEWERS, MAPLE RIDGE
Contractor: Golden Crossing Constructors Joint Venture
Description: Installation, welding, coating and testing of two parallel GVRD 760mm diameter and 1076 diameter sanitary force-main steel pipes approximately 300m long, including tie-ins to existing line, and decommissioning of temporary bypass line. Installation of 191m of 600mm HDPE sanitary sewer pipe including tie-ins to existing manholes. See photo.
     


CORVETTE WAY TRUNK BYPASS, RICHMOND
Owner: Wall Center Richmond Construction Ltd.
Description: Installation of twin 60m of 900mm HFPE bypass pipes along with installation of box culvert manholes. Installation and testing of 200m HDPE water-main pipe. Work involved directional drilling under and along shoulder of Sea Island Way.

 
2008   ACKROYD PUMP STATION, RICHMOND
Owner: City of Richmond
Description: Installation and commissioning of a fiberglass tank sanitary pump station and the removal of an existing pump station. See photo.
     
    COUGAR CREEK PIPE ARCH CULVERT REHABILITATION, DELTA
Owner: Corporation of Delta
Description: Supply and installation of approximately 40 meters of corrugated steel plate and the removal of approximately 400 cubic meters of river rock.
     
    FIRELINE, MAPLE RIDGE & GOLF COURSE, PITT MEADOWS
Owner: Golden Crossing Constructors JV
Description: Fireline: Supply and installation of 200 mm PC350 mortar lined pipe as a fire service water-main. Golf Course:  Storm culvert extension and relocation of flap and sluice gates at Meadow Golf Course.
     
    FORESTER LIFT STATION, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Retrofitting of existing sewage pump station; supply and installation of new manhole; construction of new valve pit structure; installation of pumps; installation and commissioning of permanent genset and kiosk.
     
    BROADWAY PUMP STATION, PORT COQUITLAM
Owner: City of Port Coquitlam
Description: Upgrade of Broadway Sanitary Pump Station, replacement of two existing pumps, replacement of existing kiosks.
     
    LYNN VALLEY ROAD SUPPLY MAIN, NORTH VANCOUVER
Owner: Greater Vancouver Regional District
Description: Construction of seismic upgrades for the Lynn Valley Road supply main and pipe crossing abutments. See photo.
     
   

1100 MARINE DRIVE, WEST VANCOUVER

Owner: District of West Vancouver
Description: Installation of oil interceptor and related piping along Marine Drive near 11th Street
.
     
    SOUTHPORT (ELGIN) PUMP STATION, SURREY
Owner: City of Surrey
Description: Supply, construction and commissioning of a sanitary pump station and control building including related utilities. Supply and installation of a sanitary sewer including service connections.
See photo.
     
 
CAMP FIRCOM - SEWAGE OUTFALL, GAMBIER ISLAND
Owner: Camp Fircom Society of the United Church of Canada
Description: Construction of a sewage outfall complete with a marine section on Gambier Island.
See photo.
   
2007   FRANCIS ROAD PUMP STATION, RICHMOND
Owner: City of Richmond
Description: Major refurbishment of the existing Francis Road Drainage Pump Station to bring it to an upgraded, fully functioning system. See photo.
     
    ALDERSIDE, PORT MOODY
Owner: City of Port Moody
Description: Upgraded storm sewer including the installation of three manholes and pipe by slip-lining
.
     
    190A ST PUMP STATION, PITT MEADOWS
Owner: District of Pitt Meadows
Description: The construction of a sanitary pump station and ancillary work at 190A Street Pitt Meadows
.
     
    BEDFORD SANITARY PUMP STATION, LANGLEY
Owner: Parklane Ventures (MacCedar) Ltd.
Description: Construction and commissioning of a 5m x 7m Motor Control Center building (including genset and HVAC) and installation of the supplied 2.4m fiberglass tank and submersible pumps. See photo.
     
    BRAND SANITARY PUMP STATION, PORT COQUITLAM
Owner: City of Port Coquitlam
Description: Upgrade of the pump station including side grading and construction of concrete kiosk pad, replacement of two existing pumps, guide bars, piping and valve, mixer, installation of generator and replacement of existing kiosk.
     
    HAWTHORNE NORTH - PUMP STATION UPGRADE, DELTA
Owner: The Corporation of Delta
Description: Upgrading of existing pump station including installation of new fiberglass tank and electrical kiosk.
     
    THOMPSON SANITARY LINE, WEST VANCOUVER
Owner: District of West Vancouver
Description: Replacement of sanitary line in easement using pipe bursting method.
See photo.
   
2006   GRAYBAR, RICHMOND
Owner: Farrell Estates Ltd.
Description: Installation of storm sewer on Dyke Road, 6831 Graybar Rd. Richmond and completed related work.
     
    CRIPPEN REGIONAL PARK, BOWEN ISLAND
Owner: Greater Vancouver Regional District
Description: Supply and installation of PVC sewer lines including 5 manholes and connections to cottages
.
     
    CAPILANO GOLF AND COUNTRY CLUB, WEST VANCOUVER
Owner: Capilano Golf and Country Club
Description: Repair of approximately 15 locations of the Hadden Creek rock channel lining, including all materials and all other related work, plus replacement of the two golf cart crossings at the 12th fairway.
See photo.
     
    REMOVAL OF SOUND BARRIER FENCE, CAPILANO WATERSHED
Owner: Greater Vancouver Water District
Description: Removal of approximately 1000m of sound barrier fence, plus removal and storage of approximately 200m of sound barrier fence from along the Capilano Watershed, Mainline Road.
     
    CONSTRUCTION OF HIGHWAY 99 CORRIDOR DRAINAGE WORKS, DELTA
Owner: The Corporation of Delta
Description: Supply and installation by pipe jacking of approximately 75m of 1200mm diameter concrete pipe under Hwy 99, and approximately 72.5m of 1200mm diameter concrete pipe under the BC Railway. See photo.
     
    WESTHAM ISLAND FLOODBOX UPGRADES NO. 133 & 134, DELTA
Owner: The Corporation of Delta
Description: Upgrading of the two existing flood boxes, including relining the existing 600mm diameter corrugated steel pipe culverts with an HDPE liner, grouting of the annular space, and installation of the new flap and sluice gates. A timber access walkway was also installed around flood box #133.
   
2005   COLLINGS WAY AND NORUM PLACE, DELTA
Owner: The Corporation of Delta
Description: Retrofitted the existing pump stations, relocated the electrical kiosk and other various related work.
     
    HAWTHORNE SOUTH PUMP STATION,DELTA
Owner: The Corporation of Delta
Description: Retrofitting an existing fiberglass pump station, installation of a new valve chamber, and installation of a new force-main complete with tie-in connections.
     
    KYLE STREET STORM DRAIN, PORT COQUITLAM
Owner: Greater Vancouver Sewerage and Drainage District
Description: Construction of the new Kyle Street Storm Drain, and the installation of the City of Port Moody Storm Sewer Pipe using 1200mm pipe and 450mm pipe on the Port Moody side.
     
    BEAR CREEK/WEST NEWTON SEWAGE PUMP STATIONS, SURREY
Owner: City of Surrey
Description: Replacement of the Bear Creek and West Newton Sewage Pump stations by installing two new fiberglass pump stations inside the existing steel wet wells.
See photo.
     
    HARBOUR STORM PUMPING STATION, PORT COQUITLAM
Description: Installation of a second screw pump at the Harbour Storm Pumping Station.
     
    BLAKE RAVINE EMERGENCY STORM SEWER REPAIRS, DELTA
Owner: Corporation of Delta
Description: Emergency culvert stabilization works at the Blake Creek crossing of 112th Street. See photo
.



    TROUT LAKE SANITARY TRUNK SEWER, VANCOUVER
Owner: Greater Vancouver Sewerage and Drainage District
Description: Installation of approximately 1.3km of corrosion resistant sewer pipe and manholes. Installation of 580m of pipe in a special open trench section, involving continuous sheet pile shoring and dewatering and over-excavating the trench bottom to firm bearing, through a soft peat and silt soil. Construction of  200m long by 1.6m diameter tunnel, with installation of 900mm diameter PVC sewer pipe, and placement of cellular concrete in the annular space between the pipe and the tunnel liner.
See photo.
   
2004   LULU ISLAND WASTEWATER TREATMENT PLANT, RICHMOND
Owner: Greater Vancouver Sewerage and Drainage District
Description: Installation of two sections of 2100mm diameter steel pipe, construction of reinforced concrete chamber, modification and restoration of the chlorine contact outfall chamber and related work. See photo
.
     
    STANLEY STREET DRAINAGE, NEW WESTMINSTER
Owner: City of New Westminster
Description: Emergency repair work of dyke and pump station. See photo.
   
2003   NELSON ROAD, WEST VANCOUVER
Owner: District of West Vancouver
Description: Installation of a new 10in poly storm sewer line from Nelson Road to Ocean.
     
    SEYMOUR HATCHERY UPGRADE, NORTH VANCOUVER
Owner: Greater Vancouver Water District
Description: Construction of the Seymour Hatchery Upgrade Project in North Vancouver and related work. See photo.
   
2002   EAST OLIVER STORMWATER BYPASS, FLOW CONTROL STRUCTURE, DELTA
Owner: Corporation of Delta
Description: Construction and installation of flow control.
     
    EAST NEWTON DRAINAGE PUMP STATION LEVELLING, SURREY
Owner: City of Surrey
Description: Raising and levelling the East Newton Drainage Pump Station.
     


GILLESPIE PUMP STATION STORAGE TANK, DELTA
Owner: Corporation of Delta
Description: Construction of the Gillespie Pump Station Storage and related work.
     
    SLIPLINING OF WILLINGDON COMBINED SEWER, BURNABY
Owner: Greater Vancouver Sewerage and Drainage District
Description: Supplied and installed approx. 150 metres of 900 mm diameter and 250 mm diameter PVC pipe by sliplining. Repaired damaged section of existing outfall.
     
    LADNER TRUNK PUMP STATION UPGRADE & FORCEMAIN VALVES INSTALLATION, DELTA
Owner: Corporation of Delta
Description: Upgrading of Delta Booster Station
   
2001   CULVERT REHABILITATION PROGRAM, BURNABY
Owner: City of Burnaby
Description: Rehabilitation of existing culverts by sliplining and construction of new inlet and outlet structures.
See photo.
     
    GILBERT ROAD PUMP STATION, RICHMOND
Owner: City of Richmond
Description
: Installation of one 24' x 11' rectangle x 3' deep sump by caisson method. See photo.
     
    HERITAGE BARN, MAPLEWOOD FARM, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Repaired, renovated and constructed a new foundation for the Heritage Farm - Maplewood Children's Farm.
   
2000   KINSMEN FIELD ALUMINUM BLEACHER, NORTH VANCOUVER
Owner: City of North Vancouver
Description: Coordinated the installation of a 610 person capacity aluminum bleacher. See photo.
     
    PORT KELLS PUMP STATION, SURREY
Owner: City of Surrey
Description: Renovation of existing pump station.
See photo.
     


MOUNTAIN HIGHWAY & DOMINION STREET SEWAGE LIFT STATION,
NORTH VANCOUVER

Owner: District of North Vancouver
District: Completed pump station retrofitting works at Mountain Highway and Dominion Street sewage lift station.
     
    THAIN CREEK CULVERT REPLACEMENT, NORTH VANCOUVER
Owner: City of North Vancouver
Description: Construction of the Thain Creek replacement concrete culvert, and open channel drainage and landscaping work, all under strict environmental guidelines.
See photo.
     
    SUICIDE BEND SHORELINE PROTECTION, WEST VANCOUVER
Owner: District of West Vancouver
Description: Performed erosion control work, including excavation of existing shoreline and construction of specified shoreline protection works. Restored localized areas of bank degradation at elevations above shoreline protection works.
See photo.
     
    CULVERT REHABILITATION PROGRAM, BURNABY
Owner: City of Burnaby

Description: Rehabilitated 35m of 2000mm x 1200mm CSP culvert, 25m of 1200mm diameter RC culverts & constructed fisheries improvements. Constructed impact stilling basin at end of 750mm diameter RC culvert.

     
    REFURBISHING DUNDARAVE PARK PLAYGROUND, WEST VANCOUVER
Owner: District of West Vancouver
Description: Removal and replacement of outdated play equipment, paths, retaining walls, landscaping and play structures. See photo.
   
1999   DOLLARTON HIGHWAY, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Construction of 360m of trunk storm sewer, outfall structure, shoreline works, 210m of water-main, erosion and sediment control and related works.
See photo.
     
    CHILCO BYPASS & BROCTON WEIR, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description: Re-routed sanitary and storm sewers to decrease the amount of raw sewage dumping into the Burrard Inlet during heavy rainfall.
   
1998   NEW WESTMINSTER INTERCEPTOR, NEW WESTMINSTER
Owner: GVRD Sewage & Drainage Department
Description: A 900m long section of 1050 to 1500mm diameter concrete sewer main was temporarily bypassed above ground to allow for the rehabilitation of the concrete sewer main with Linabond PVC polymer.
See photo.
     
    CYPRESS/HOLLYBURN SEWER LINK, WEST VANCOUVER
Owner: Ministry of Environment, Lands & Parks
Description: Connection of a 200mm diameter sewer line in a 10m vertical section.
See photo.
     
    HUDSON STREET GRIT CHAMBER, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description: Installed a 2400mm x 1500mm pre-cast concrete box culvert grit chamber adjacent to the Hudson Street pump station.
     
    VERNON DRIVE FORCEMAIN, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description:The largest live sewer tie-in performed in Canada
(45" diameter steel sewer line).
   
1997   HATZIC SLOUGH SUPPLY MAIN, MISSION
Owner: Fraser River Regional District
Description: A 1050 diameter, 1km long steel pipe was pulled across the Fraser River in Mission during harsh winter conditions. Work included dredging a 900m long trench across the Fraser, 500m of open trench land installation and installing a below grade concrete valve chamber.  See photo.
     
    DEEP COVE SEWAGE PUMP STATION UPGRADE, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Installation of two pump stations and upgrading of a third. See photo.
   
1996   MCBRIDE BOULEVARD SEWER VENT, NEW WESTMINSTER
Owner: GVRD Sewage & Drainage Department
Description: Constructed odor control facilities.



    STEEL CASING PIPE, BURNABY
Owner: GVRD, Water Engineering
Description: Installation of a1525mm steel casing pipe inside a 2m diameter tunnel liner under the Westburnco water reservoir.
See photo.
   
1995   ANSELL PLACE WASTE WATER TREATMENT PLANT OUTFALL REHABILITATION, WEST VANCOUVER
Owner: District of West Vancouver
Description: Construction of 2.5m outfall over the West Vancouver foreshore.
See photo.
     
    LINCOLN AVE. LIFT STATION PORT COQUITLAM
Owner: City of Port Coquitlam
Description:
Constructed a small pump station using two cages and performed related tie-ins.
     
    DOMINION AVENUE LIFT STATION, PORT COQUITLAM
Owner: City of Port Coquitlam
Description: 3m x 3m caisson pump station was sunk and related works completed.
     
    CANADA WAY/GILMORE WATERMAN REHABILITATION, BURNABY
Owner: City of Burnaby
Description
: Slip lining of an existing 900m long, 710mm diameter steel forcemain with a 600mm HDPE pipe along a major arterial road. See photo.
     
    8TH AVENUE INTERCEPTOR & KEITH DRIVE, VANCOUVER
Owner: Great Vancouver Regional District
Description: Installation of sheet piling for deep excavation needed to join a tunnel between the 8th Avenue Interceptor and the Brockton Sewer.
See photo.
    .
    HIGHBURY INTERCEPTOR OVERFLOW STRUCTURE MODIFICATIONS, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description: Raised an overflow weir for the Brocton sewer outfall to Iona Island.
   
1994   EASTRIDGE FORESHORE SEWER PROJECT, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Installation of a sewer forcemain, including a pump station and 165m of underwater main along the extremely environmentally sensitive Deep Cove foreshore. See photo.
     
    SLOPE STABILIZATION, PARKSIDE LANE, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Construction of an approximately 9m high lock block wall with access only via the beach foreshore. See photo.
     
    STORM & SANITARY SEWER SEPARATION AT SKEENA TERRACE, VANCOUVER
Owner: British Columbia Housing Management Commission
Description: Separated storm and sanitary sewers in Skeena Terrace.
   
1993   EAST RICHMOND AGRICULTURAL WATER SUPPLY , RICHMOND
Owner: City of Richmond
Description: Construction of a100kW irrigation pump station (caissons method) adjacent to the Fraser River, with a 91m long, 1220mm diameter intake pipe going into the river. Completion of related works to provide irrigation for the cranberry fields.
See photo.
     
    CARIBOO DAM APRON REPAIR, BURNABY
Owner: Greater Vancouver Regional District
Description: Placement of concrete at the front of the Cariboo Dam and installation of a tarp wall to isolate the "concrete water" from the rest of the reservoir. See photo.
     
    WOODLANDS/SUNSHINE WATER SYSTEM, NORTH VANCOUVER
Owner: District of North Vancouver
Description: Installed approximately 5.5km of pipe, 300mm and 200mm diameter, along the shores of Indian Arm. Work included the installation of two concrete PRV chambers and an approximately 500m long, 250mm diameter underwater main. 66% slope in many areas.
   
1992   DOMINION AVENUE PUMP STATION, PORT COQUITLAM
Owner: City of Port Coquitlam
Description:  Installation of a pump station and excavation of a retention pond, to accommodate the increased run-off predicted for an upcoming development.
See photo.
     
    HASTINGS TIE-IN CHAMBER, VANCOUVER
Owner: GVRD Sewage & Drainage Department
Description: Installed tie-in chambers.
   
1990   WILLIAM STREET AT CASSIAR, VANCOUVER
Owner: City of Vancouver
Description
: Installation of a1525mm diameter concrete pipe, 60m in length, under Highway 1. See photo.
   
1989   GULF VIEW WYND STORM SEWER OUTFALL & IMPROVEMENTS, DELTA
Owner: The Corporation of Delta
Description: Installation of a 450mm diameter steel pipe for a storm sewer between the US and Canadian borders. Installation of a 600m storm outfall, a concrete outfall structure, and a storm and sanitary main. Highlights included descending 70m on a 50 plus degree slope and the installation of a concrete dissipation chamber. Maximum slope 87.33%.
See photo.
   
1988   BC FILM CENTRE ROADS & SERVICES, BURNABY
Owner: British Columbia Enterprise Corporation
Description: First contract for Merletti Construction Ltd. Involved the construction and installation of storm, water-main, sanitary, roads, pump station and hard landscaping.
 

 
 
 